Engineered for a high-throughput coastal bulk terminal requiring an unobstructed column-free area of 2,520 m² (27,125 sq ft). Continuous double-chord lattice trusses anchored directly to perimeter concrete stub walls.
High-resolution photographs supplied for this project. Duplicate 720-pixel versions and images carrying visible labels were excluded.
This mega clear-span canopy structure operates in severe coastal humidity and high cyclic gust environments. Structural steel trusses are hot-dip galvanized to ISO 1461, forming an impermeable intermetallic barrier that withstands continuous salt fog exposure.
| Clear Span Width | 21.00m (68.9 ft) column-free interior |
|---|---|
| Overall Length | 120.00m (393.7 ft) · 24 modular bays @ 5.0m |
| Apex Ridge Height | 8.50m (27.9 ft) above footing level |
| Main Chord Steel | Ø76 × 3.25mm Q355B high-frequency welded circular tube |
| Web Member Lattice | Ø48 × 2.50mm diagonal tubular braces |
| Corrosion Class | ISO 1461 Hot-Dip Galvanizing, average coating thickness 85μm - 120μm |
| Architectural Membrane | 900g/m² high-tenacity PVDF tensioned architectural membrane |
| Flame Retardancy | DIN 4102 B1 / NFPA 701 compliant self-extinguishing |
| Design Standard | ASCE 7-22 / Eurocode 1 & 3 structural calculations |
Foundation System: The truss base plates (20mm Q355B with four M24 chemical expansion anchor bolts) are anchored to a 1.2m reinforced concrete retaining push-wall, allowing wheel loaders to stockpile bulk raw material directly against walls without damaging steel columns.
Roof Membrane Tensioning: Membrane sections are laced through extruded aluminum keder tracks with continuous ratchet pipe sleeves along the perimeter eave line, creating a drum-tight skin that prevents wind flutter and aerodynamic tear-off.
The complete 21×120m structural kit, including 25 arch trusses, purlins, cross-cables, fabric skin, and hardware, shipped efficiently packed into four 40ft High Cube (40HQ) containers.
Architectural elevation drawing showing truss chord radius, apex splices, purlin spacing @ 1.25m, and perimeter base plate anchor spacing.