Project Code: TS-3557 AutoCAD Vault Verified ISO 1461 Galvanized

35×57m Bulk Material Space-Frame Canopy

Engineered from AutoCAD blueprint 34x57m-LAYOUT-35X57M TRUSS SHELTER LAYOUT.pdf. Delivers 2,000 m² of unobstructed industrial clear space for mining ore and fertilizer storage.

2D Structural CAD Engineering Blueprint

Direct Export from AutoCAD Engineering Vault
35×57m Bulk Material Space-Frame Canopy CAD Drawing

AutoCAD general layout showing foundation pier spacing, truss rib coordinate geometry, apex crown connection detail, and endwall equipment drive-in framing.

Engineering Specifications & Structural Metallurgy

Clear Span Width35.00m (114.8 ft) completely column-free
Overall Length57.00m (187.0 ft) continuous covered structure
Ridge Apex Height12.50m (41.0 ft) clearance for heavy dump trucks
Main Chord TubesØ114 × 4.0mm Q355B seamless structural pipe
Foundation AnchoringReinforced concrete foundation piers with M30 studs
Design Wind Load135 km/h (84 mph) extreme cyclone rating
Design Snow Load1.5 kN/m² (150 kg/m²) ground snow load
Membrane Coating950g/m² TiO2 self-cleaning PVDF architectural skin

Civil Mounting & Erection Protocol

Foundation Connection: Engineered for zero-damage mounting over standard ISO 20ft/40ft shipping containers using heavy cast-steel twist-lock clamps and weld-on base channels. Eliminates the requirement for permanent ground excavation and poured concrete slabs.

Corrosion Protection: Entire framework submerged into 450°C molten pure zinc (ISO 1461), achieving an 85 μm - 120 μm intermetallic alloy barrier guaranteed for 25+ years against maritime salt spray and harsh mining dust.

Packaging & Rapid Handover

Supplied pre-bundled with PE shrink wrap and custom wood dunnage skids. Erection requires no on-site welding or reaming, completed in 2-3 working days.