Engineered from AutoCAD blueprint 34x57m-LAYOUT-35X57M TRUSS SHELTER LAYOUT.pdf. Delivers 2,000 m² of unobstructed industrial clear space for mining ore and fertilizer storage.
AutoCAD general layout showing foundation pier spacing, truss rib coordinate geometry, apex crown connection detail, and endwall equipment drive-in framing.
| Clear Span Width | 35.00m (114.8 ft) completely column-free |
|---|---|
| Overall Length | 57.00m (187.0 ft) continuous covered structure |
| Ridge Apex Height | 12.50m (41.0 ft) clearance for heavy dump trucks |
| Main Chord Tubes | Ø114 × 4.0mm Q355B seamless structural pipe |
| Foundation Anchoring | Reinforced concrete foundation piers with M30 studs |
| Design Wind Load | 135 km/h (84 mph) extreme cyclone rating |
| Design Snow Load | 1.5 kN/m² (150 kg/m²) ground snow load |
| Membrane Coating | 950g/m² TiO2 self-cleaning PVDF architectural skin |
Foundation Connection: Engineered for zero-damage mounting over standard ISO 20ft/40ft shipping containers using heavy cast-steel twist-lock clamps and weld-on base channels. Eliminates the requirement for permanent ground excavation and poured concrete slabs.
Corrosion Protection: Entire framework submerged into 450°C molten pure zinc (ISO 1461), achieving an 85 μm - 120 μm intermetallic alloy barrier guaranteed for 25+ years against maritime salt spray and harsh mining dust.
Supplied pre-bundled with PE shrink wrap and custom wood dunnage skids. Erection requires no on-site welding or reaming, completed in 2-3 working days.