
A curved steel lattice arch carrying a pre-stressed PVDF membrane. No internal truss, no column in the floor area, daylight through the roof, and a modular length you can extend bay by bay.
An arched tensile structure does not hide a truss behind a fabric skin. The curved lattice arch is the primary structure, and the membrane is tensioned across it in a double-curved surface. That single decision removes the internal bracing that limits headroom and blocks lighting rigs in a conventional frame tent.
The result is a hall with a completely clear floor, a ridge height that stays usable across the whole span, and a roof that diffuses daylight instead of shadowing the interior. Bays bolt together on site, so a 20 m hall today can become a 100 m hall next season without a new structural design.
Typical buyers are event contractors who need a repeatable hall, exhibition organisers who need a fast build and a clean sightline, and industrial clients who need a covered yard that goes up in days rather than months.

The lattice arch carries the roof; the membrane is tensioned across it. Photographed during fit-out, before the end walls were closed.
Q235B or Q355B tube chords with welded lattice webs, hot-dip galvanised to ISO 1461. Each arch is a single transportable segment bolted to the next at the ridge, so no site welding and no crane for standard spans.
White translucent PVDF as standard, blackout and insulated build-ups on request. The membrane is tensioned to a defined pre-stress so it does not flutter, and every panel is numbered and cut to the arch geometry.
Concrete pad anchors for permanent halls, ballast or water weights where nothing may be drilled, and ISO container mounts where the client wants the containers to act as side walls and counterweight at the same time.
Membrane weight, arch section and anchor type are confirmed per project after the wind and snow calculation. Figures above are the standard range, not a fixed specification.
Ridge height and bay module are standard values. Length is unlimited in bay increments; wind and snow capacity is calculated for the site, not taken from a catalogue table.
| Model | Clear span | Ridge height | Bay | Membrane | Typical use |
|---|---|---|---|---|---|
| SB-ATS-10 | 10 m | 6.5 m | 3 m | 850 g/m2 | Pavilion, wedding, gate canopy |
| SB-ATS-15 | 15 m | 8.0 m | 3 m | 850 g/m2 | Event hall, exhibition stand, sport court |
| SB-ATS-20 | 20 m | 9.5 m | 4 m | 950 g/m2 | Banquet hall, indoor tennis, storage |
| SB-ATS-25 | 25 m | 11.0 m | 4 m | 950 g/m2 | Exhibition hall, equestrian, warehouse |
| SB-ATS-30 | 30 m | 12.5 m | 5 m | 1050 g/m2 | Large event arena, bulk storage |
| SB-ATS-40 | 40 m | 15.0 m | 5 m | 1050 g/m2 | Sports hall, industrial cover |
| SB-ATS-50 | 50 m | 17.5 m | 5 m | 1050 g/m2 | Stadium annex, mining cover |
Eave height, door openings and end-wall type are set per project. A full GA drawing is issued before production.
The same arch and membrane system covers hospitality, exhibition, sport and storage. The difference between them is the end wall, the floor and the climate package, not the structure.
Seated receptions and gala dinners on a completely clear floor, with the membrane roof lit from inside.
Repeatable stand grids, a clean sightline down the hall and a facade that can carry the organiser's branding.
Indoor tennis, padel, five-a-side and training courts where the arch height stays usable across the span.
Concerts, award ceremonies and community events, with glass or clear end walls for an open front.
Temporary or semi-permanent covered yard space where a permanent building is not justified yet.
Relocatable halls that move with the event calendar; bays are numbered so the hall rebuilds the same way.
Photographs from delivered arched tensile structures: single halls, multi-bay rows and night events.



Project photographs are published with the client's permission; site details are withheld on request.
Set out the grid, cast the pads or place the ballast. Anchor positions come from the GA drawing, so the base is finished before the container arrives.
Bolt arch segments on the ground, lift or tilt them into position and connect the purlins. Standard spans need no crane and no site welding.
Pull the numbered panels over the arches, tension to the specified pre-stress and close the keder or lacing line. This is the step that decides how the roof performs in wind.
Fit glass, ABS or PVC end walls, doors, lighting and HVAC penetrations, then hand over with the as-built drawing set.

Three systems overlap in span. The choice is driven by how permanent the hall must be, how much the client will pay for architectural finish, and whether the roof must carry extra load.
| Requirement | Arched tensile (this page) | Luxury sailcloth tent | Aluminium clear span |
|---|---|---|---|
| Span range | 10-50 m | 10-60 m | 10-70 m |
| Roof structure | Curved steel lattice arch | Timber king poles, catenary cables | Extruded aluminium box beam portal |
| Best for | Repeatable event and exhibition halls | Wineries, weddings, hospitality | Permanent warehouses, glass facade buildings |
| Rigidity | High, engineered arch | Medium, cable-braced | High, rigid frame |
| Typical build | 5-8 days | 3-6 days | 3-6 weeks |
It is a clear-span hall in which the roof structure and the roof covering are the same element: a curved steel lattice arch carries a pre-stressed PVDF membrane that is tensioned directly over the arch. There is no separate truss inside the hall and no column in the floor area, so the full span is usable.
Our standard arched tensile range runs from 10 m to 50 m clear span, in modules that combine freely along the length so a hall can be extended without a new structural design. Spans outside that band are engineered as project-specific variants.
Yes. The standard 850-1050 g/m2 white PVDF membrane transmits diffused daylight, so the hall is usable without artificial light for most of the day. A blackout membrane and a double-layer insulated build-up are available when the client needs a dark or climate-controlled space.
Yes, in the insulated configuration: a second membrane layer with an insulation quilt in between, plus sealed end walls. Heating, ventilation and cooling are sized by the local MEP engineer; we provide the envelope and the fixing details.
Every structure is calculated for the actual site: design wind speed, terrain category, altitude and the local snow load map. Typical export projects are engineered for 120-180 km/h design wind and 0.5-3.5 kN/m2 snow, verified by a stamped calculation package.
A 20 m x 40 m hall is normally erected by a six-person crew in 5-8 working days, including membrane tensioning. The kit ships with numbered members, a GA drawing and an erection sequence, so no site welding and no heavy crane are required for standard spans.
Yes. Send the span, the length and the site location and we return a GA drawing, a membrane layout and an indicative price within 48 hours.
Send the span, the site and the load case. Our engineer returns a GA drawing, a membrane layout and an indicative price.
Or message us directly: WhatsApp +86 139 2871 7650