Home / Products / AIR DOMES / air-dome-30m-span-130m-len
Air Dome 30m Span · Cable Net

30m (100ft) Span 2-Court Tennis & Pickleball Air Dome - 130m Length

Cable-net harnessed air-supported arena with 1100 g/m² dual-layer thermal membrane, smart 200–450 Pa VFD pressure control, and 160 km/h typhoon resistance over 3900 m².

Request Instant Technical Quotation View All AIR DOMES Models →
30m (100ft) Span 2-Court Tennis & Pickleball Air Dome - 130m Length
Verified Category Reference: AIR DOMES
Clear Span Width
30m (100ft) Zero-Column Span
Modular Length
130m (426ft) Continuous Enclosure
Wind Code Standard
Certified Site-Specific ASCE 7 / EN
Fire Safety Standard
DIN 4102 B1 / NFPA 701 Compliant
Comprehensive Technical Brief

Functional Purpose & Operational Capability

High-efficiency pneumatic cable-net architectural enclosure engineered for multi-court indoor tennis centers, FIFA-standard indoor soccer pitches, Olympic aquatic natatoriums, and zero-emission coal/mineral bulk storage stockpiles. Eliminates all rigid internal columns and trusses.

Spatial Geometry & Volumetric Clearances

Clear span of 30m (98 ft) by continuous length of 130m (427 ft), enclosing an immense 3,900 m² (41,979 sqft) footprint and massive clear volume up to 25,740 m³. Parabolic dome crown rises to 9.6m.

Materials Metallurgy & Flame Retardancy

Dual-layer envelope featuring 1100 g/m² exterior high-pressure PVDF membrane and 450 g/m² acoustic thermal liner. Certified DIN 4102 B1, NFPA 701, and UL 94 V-0. Inner and outer layers form a 500mm insulating thermal air pocket delivering R-16 thermal performance.

Wind & Snow Load Engineering Certification
Designed under ASCE 55-16 (Tensile Membrane Air-Supported Structures). Patented orthogonal bias-laid Ø12mm–Ø16mm aircraft steel cable net anchors directly to reinforced perimeter concrete foundation beams. Automatic variable-frequency blowers boost internal pressure from 250 Pa to 450 Pa during storm alerts, resisting up to 150 – 160 km/h typhoon gusts.
Technical Parameters

Engineered Data Sheet & Erection Specifications

Precision dimensions, material metallurgy, and field logistics parameters for Model air-dome-30m-span-130m-len.

Clear Span Width30m (100ft) Zero-Column Span
Building Length130m (426ft) Continuous Enclosure
Erection Timeline & CrewMobilized and deployed within 5 to 7 working days by a specialized 8-person crew. Once perimeter foundation clamps and cable harness are anchored, inflation to full structural rigidity requires only 2 to 3 hours via industrial centrifugal blowers.
Fire Safety RatingDIN 4102 B1 / NFPA 701 Method 2 / EN 13501-1
Corrosion ProtectionISO 1461 Hot-Dip Galvanized (≥85μm) or Architectural AA15 Anodized
Wind & Snow CalculationDesigned under ASCE 55-16 (Tensile Membrane Air-Supported Structures). Patented orthogonal bias-laid Ø12mm–Ø16mm aircraft steel cable net anchors directly to reinforced perimeter concrete foundation beams. Automatic variable-frequency blowers boost internal pressure from 250 Pa to 450 Pa during storm alerts, resisting up to 150 – 160 km/h typhoon gusts.
Request Customized Proposal & Stamped CAD Drawings →
Engineering Blueprints & CAD Section Details PE Stamped

Structural Cross-Section & Connection Topology for 30m (100ft) Span 2-Court Tennis & Pickleball Air Dome - 130m Length

Every Champion project is manufactured strictly from CNC-driven CAD/CAM fabrication packages. Structural nodes, chord junctions, baseplate anchor details, and membrane tensioning tracks are analyzed under finite element analysis (FEA) to confirm full compliance with international building codes.

Standard Engineering Parameters:
  • Engineered Span: 30m (100ft) Zero-Column Span with 100% column-free interior volume
  • Structural Material: Precision Q355B Hot-Dip Galvanized or 6082-T6 Hard-Anodized Alloy
  • Membrane Cover: Flame Retardant Architectural PVDF (1100 g/m²)
  • Design Standards: Certified to ASCE 7-16, Eurocode EN 1991, and EN 13782
30m (100ft) Span 2-Court Tennis & Pickleball Air Dome - 130m Length Engineering CAD Blueprint
DWG / REVIT / STEP 3D COMPLIANT
Material Science & Metallurgy

Architectural PVDF Membrane Engineering Matrix (750g – 1400g/m²)

Pre-stressed, anti-wicking, low-creep architectural textiles engineered with multi-layer PVDF/PVF lacquering for self-cleaning performance, UV shielding (UPF 50+), and permanent flame retardancy.

Areal Weight Membrane Grade Tensile Strength (Warp/Weft) Tear Resistance Light Transmittance Temperature Range Fire Retardancy Standard Primary Industrial Role
750 g/m² Architectural PVC/PVDF 3000 / 2800 N/5cm 380 / 350 N 15% Translucent -30℃ ~ +70℃ DIN 4102 B1 / NFPA 701 Event Marquees, Canopy Sidewalls, Sailcloth Roofs
850 g/m² Heavy Duty Blockout PVDF 4000 / 3500 N/5cm 500 / 450 N 0% (100% Blockout) -40℃ ~ +70℃ DIN 4102 B1 / M2 / B-s2,d0 Standard Industrial Warehouses, Aluminum Clear Span
900 g/m² Reinforced Industrial Grade 4500 / 4000 N/5cm 550 / 500 N 10% Translucent -40℃ ~ +70℃ DIN 4102 B1 / NFPA 701 Container Mounted Shelters, Heavy Logistics Bays
1000 g/m² Extreme Weather Mining Grade 5000 / 4500 N/5cm 620 / 580 N 8% Translucent -45℃ ~ +75℃ DIN 4102 B1 / AS 1530 Mining Operations, Aggregate Domes, Salt Sheds
1100 g/m² High-Pressure Air Dome Membrane 5500 / 5000 N/5cm 750 / 700 N 12% Diffuse Glow -40℃ ~ +70℃ DIN 4102 B1 / EN 13501 Cable-Net Air Domes, Sports Arenas, Eco Storage
1200 g/m² Permanent Architectural PVDF/PTFE 6000 / 5500 N/5cm 850 / 800 N 8% Controlled Lux -50℃ ~ +80℃ Class A1 / DIN 4102 B1 Aviation Hangars, Permanent Terminals, Sports Stadiums
1400 g/m² Ultra-Heavy Marine & Blast Shield ≥7000 / 6500 N/5cm 1100 / 1000 N 0% Total Solar Block -50℃ ~ +85℃ DIN 4102 B1 / UL 94 V-0 Port Bulk Cargo, Military Fortified, Chemical Containment
✔ All membranes certified DIN 4102 B1, NFPA 701, and EN 13501-1 Class B-s2,d0
✔ 15-Year Pro-Rata Warranty with zero degradation under extreme coastal salt-spray
✔ Dual-layer thermal insulation liner options (R-12 to R-24) available across all weights
Field Construction Protocol

Engineered 8-Step Installation Methodology for 30m (100ft) Span 2-Court Tennis & Pickleball Air Dome - 130m Length

Rapid deployment methodology requiring zero on-site welding. Modular bolted connections reduce field erection schedules by up to 70% compared to conventional structural steel.

01

Topographical Survey & Grid Staking

Laser level and total station establish precise axial centerlines, column offsets, and elevation datums across the clear-span foundation grid.

02

Base Plate Anchoring & Torquing

Heavy cast-in base plates, chemical anchor studs (Grade 8.8), or helical earth anchors are drilled and torqued to specified kN pullout resistance.

03

Ground Truss Assembly & Lacing

Space-frame chord segments, web lacing members, and connection gusset plates are assembled and bolted flat on grade prior to hoisting.

04

Synchronized Crane Hoisting

Mobile cranes elevate paired structural truss arches into vertical position; temporary stabilizing guy wires maintain plumbness and stability.

05

Purlins, Struts & X-Cable Bracing

Longitudinal purlins, eaves struts, and pre-stretched galvanized X-bracing cables are torqued into place to form a rigid 3D spatial diaphragm.

06

Keder Membrane Track Tensioning

High-tenacity PVDF roof panels are pulled through integrated aluminum extrusion tracks and mechanically tensioned via ratchet catenary winches.

07

Endwalls, Megadoors & Flashings

Hard-wall panels, vertical-lifting Megadoors, motorized louvers, perimeter rainwater gutters, and architectural flashing trims are sealed.

08

FEA Pre-Stress Torque Audit & Signoff

Calibrated torque audit of all structural fasteners, ultrasonic weld verification, membrane pre-stress tensiometer inspection, and handover documentation.

Download Full Erection Manual & Stamped CAD Drawings →

Need Custom Site Dimensions or Stamped Engineering Calculations?

Our structural engineering team provides certified calculations, foundation reactions, and full 3D CAD/BIM packages within 24 hours.

Speak With a Senior Structural Engineer