Double-truss Q355B galvanized arches mounted on ISO shipping containers with 900 g/m² rip-stop PVDF, engineered for 140 km/h mining winds over 375 m².
Rugged mining and civil construction canopy engineered to mount across standard 20ft or 40ft ISO shipping containers. Transforms unused yard space between paired container stacks into heavy-duty covered machinery maintenance workshops, bulk aggregate storage, or hazardous material handling bays.
Unobstructed span of 15m (49 ft) between container interior top rails, with modular length of 25m (82 ft). Encloses 375 m² (4,036 sqft) of protected high-clearance workspace with apex heights reaching 9.0m above container deck levels.
Constructed with 900 g/m² – 1000 g/m² heavy-duty rip-stop architectural PVDF membrane. Certified DIN 4102 B1 and NFPA 701 flame retardant. Resists industrial acid mists, diesel soot, and heavy UV exposure. Arch frames fabricated from Q235B/Q355B tubular steel with full hot-dip galvanizing to ISO 1461.
Precision dimensions, material metallurgy, and field logistics parameters for Model container-shelter-ct50-120ft.
| Clear Span Width | 15m (50ft) Clear Span |
| Building Length | 36m (120ft) Modular Length |
| Erection Timeline & Crew | Assembled in 1 to 2 days by a 4-person crew using basic boom lifts or telehandlers. Proprietary container twist-lock base clamps anchor directly into ISO corner castings without drilling, cutting, or field welding to containers. |
| Fire Safety Rating | DIN 4102 B1 / NFPA 701 Method 2 / EN 13501-1 |
| Corrosion Protection | ISO 1461 Hot-Dip Galvanized (≥85μm) or Architectural AA15 Anodized |
| Wind & Snow Calculation | Calculated to AS/NZS 1170.2 and ASCE 7-16 structural codes. Double-truss chord arch geometry delivers over 300% greater section modulus than single-tube hoops, resisting gale winds up to 120 – 140 km/h and snow surcharges up to 0.80 – 1.50 kN/m². |
Every Champion project is manufactured strictly from CNC-driven CAD/CAM fabrication packages. Structural nodes, chord junctions, baseplate anchor details, and membrane tensioning tracks are analyzed under finite element analysis (FEA) to confirm full compliance with international building codes.
Pre-stressed, anti-wicking, low-creep architectural textiles engineered with multi-layer PVDF/PVF lacquering for self-cleaning performance, UV shielding (UPF 50+), and permanent flame retardancy.
| Areal Weight | Membrane Grade | Tensile Strength (Warp/Weft) | Tear Resistance | Light Transmittance | Temperature Range | Fire Retardancy Standard | Primary Industrial Role |
|---|---|---|---|---|---|---|---|
| 750 g/m² | Architectural PVC/PVDF | 3000 / 2800 N/5cm | 380 / 350 N | 15% Translucent | -30℃ ~ +70℃ | DIN 4102 B1 / NFPA 701 | Event Marquees, Canopy Sidewalls, Sailcloth Roofs |
| 850 g/m² | Heavy Duty Blockout PVDF | 4000 / 3500 N/5cm | 500 / 450 N | 0% (100% Blockout) | -40℃ ~ +70℃ | DIN 4102 B1 / M2 / B-s2,d0 | Standard Industrial Warehouses, Aluminum Clear Span |
| 900 g/m² | Reinforced Industrial Grade | 4500 / 4000 N/5cm | 550 / 500 N | 10% Translucent | -40℃ ~ +70℃ | DIN 4102 B1 / NFPA 701 | Container Mounted Shelters, Heavy Logistics Bays |
| 1000 g/m² | Extreme Weather Mining Grade | 5000 / 4500 N/5cm | 620 / 580 N | 8% Translucent | -45℃ ~ +75℃ | DIN 4102 B1 / AS 1530 | Mining Operations, Aggregate Domes, Salt Sheds |
| 1100 g/m² | High-Pressure Air Dome Membrane | 5500 / 5000 N/5cm | 750 / 700 N | 12% Diffuse Glow | -40℃ ~ +70℃ | DIN 4102 B1 / EN 13501 | Cable-Net Air Domes, Sports Arenas, Eco Storage |
| 1200 g/m² | Permanent Architectural PVDF/PTFE | 6000 / 5500 N/5cm | 850 / 800 N | 8% Controlled Lux | -50℃ ~ +80℃ | Class A1 / DIN 4102 B1 | Aviation Hangars, Permanent Terminals, Sports Stadiums |
| 1400 g/m² | Ultra-Heavy Marine & Blast Shield | ≥7000 / 6500 N/5cm | 1100 / 1000 N | 0% Total Solar Block | -50℃ ~ +85℃ | DIN 4102 B1 / UL 94 V-0 | Port Bulk Cargo, Military Fortified, Chemical Containment |
Rapid deployment methodology requiring zero on-site welding. Modular bolted connections reduce field erection schedules by up to 70% compared to conventional structural steel.
Laser level and total station establish precise axial centerlines, column offsets, and elevation datums across the clear-span foundation grid.
Heavy cast-in base plates, chemical anchor studs (Grade 8.8), or helical earth anchors are drilled and torqued to specified kN pullout resistance.
Space-frame chord segments, web lacing members, and connection gusset plates are assembled and bolted flat on grade prior to hoisting.
Mobile cranes elevate paired structural truss arches into vertical position; temporary stabilizing guy wires maintain plumbness and stability.
Longitudinal purlins, eaves struts, and pre-stretched galvanized X-bracing cables are torqued into place to form a rigid 3D spatial diaphragm.
High-tenacity PVDF roof panels are pulled through integrated aluminum extrusion tracks and mechanically tensioned via ratchet catenary winches.
Hard-wall panels, vertical-lifting Megadoors, motorized louvers, perimeter rainwater gutters, and architectural flashing trims are sealed.
Calibrated torque audit of all structural fasteners, ultrasonic weld verification, membrane pre-stress tensiometer inspection, and handover documentation.
Our structural engineering team provides certified calculations, foundation reactions, and full 3D CAD/BIM packages within 24 hours.
Speak With a Senior Structural Engineer