Home / Products / INDUSTRIAL HANGARS / hangar-36m-span-65m-len
Hangar 36m · 34m

36m (120ft) Clear-Span Boeing 737-800 Line Maintenance Hangar - 65m Length

Engineered for Boeing 737-800 / Airbus A320 Single-Aisle Airliners with Q355B space-frame trusses, 180 km/h wind certification, and Megadoor integration over 2340 m² column-free bay.

Request Instant Technical Quotation View All INDUSTRIAL HANGARS Models →
36m (120ft) Clear-Span Boeing 737-800 Line Maintenance Hangar - 65m Length
Verified Category Reference: INDUSTRIAL HANGARS
Clear Span Width
36m (120ft) 100% Column-Free Span
Modular Length
65m (213ft) Continuous Hangar Bay
Wind Code Standard
Certified Site-Specific ASCE 7 / EN
Fire Safety Standard
DIN 4102 B1 / NFPA 701 Compliant
Comprehensive Technical Brief

Functional Purpose & Operational Capability

Purpose-built airside aviation MRO maintenance facility designed to house Boeing 737-800 / Airbus A320 Single-Aisle Airliners. Accommodates full airframe C/D checks, engine drop procedures, avionics upgrades, and rapid tarmac scramble operations. Includes unobstructed wingtip and tailfin clearances with dedicated airside ground power and utility hoist integration.

Spatial Geometry & Volumetric Clearances

Clear-span maintenance bay width of 36m (118 ft) by 65m (213 ft) continuous bay length, providing 2,340 m² (25,188 sqft) of 100% column-free interior floor area. Apex clearance reaches 17.1m with vertical-lifting Megadoor opening tailored to aircraft tailfin clearance requirements.

Materials Metallurgy & Flame Retardancy

Architectural enclosure utilizes 1200 g/m² – 1400 g/m² heavy-duty fluoropolymer PVDF textile certified to Class A2 / B-s1,d0 (EN 13501-1) and DIN 4102 B1. Self-cleaning surface repels jet fuel aerosol, exhaust soot, and hydraulic fluid droplets. Hot-dip galvanized structural hollow steel sections (Q355B) provide Class A1 non-combustible structural framework.

Wind & Snow Load Engineering Certification
Calculated in strict compliance with ASCE 7-16 (Occupancy Category III Aviation Infrastructure), Eurocode EN 1991-1-4 (Wind Actions up to 180 km/h / 50 m/s), and EN 1991-1-3 (Snow Loads up to 2.50 kN/m²). FEA load simulations account for tarmac jet blast dynamic pressures and localized roof suction effects.
Technical Parameters

Engineered Data Sheet & Erection Specifications

Precision dimensions, material metallurgy, and field logistics parameters for Model hangar-36m-span-65m-len.

Clear Span Width36m (120ft) 100% Column-Free Span
Building Length65m (213ft) Continuous Hangar Bay
Erection Timeline & CrewErection executed by an 8 – 10 person specialized aerospace construction crew. Typical mobilization to handover schedule is 10 – 15 calendar days utilizing two 25-ton mobile hydraulic cranes for synchronized paired-truss hoisting. Modular high-strength Grade 8.8 / 10.9 bolted connections eliminate all field welding on airport aprons.
Fire Safety RatingDIN 4102 B1 / NFPA 701 Method 2 / EN 13501-1
Corrosion ProtectionISO 1461 Hot-Dip Galvanized (≥85μm) or Architectural AA15 Anodized
Wind & Snow CalculationCalculated in strict compliance with ASCE 7-16 (Occupancy Category III Aviation Infrastructure), Eurocode EN 1991-1-4 (Wind Actions up to 180 km/h / 50 m/s), and EN 1991-1-3 (Snow Loads up to 2.50 kN/m²). FEA load simulations account for tarmac jet blast dynamic pressures and localized roof suction effects.
Request Customized Proposal & Stamped CAD Drawings →
Engineering Blueprints & CAD Section Details PE Stamped

Structural Cross-Section & Connection Topology for 36m (120ft) Clear-Span Boeing 737-800 Line Maintenance Hangar - 65m Length

Every Champion project is manufactured strictly from CNC-driven CAD/CAM fabrication packages. Structural nodes, chord junctions, baseplate anchor details, and membrane tensioning tracks are analyzed under finite element analysis (FEA) to confirm full compliance with international building codes.

Standard Engineering Parameters:
  • Engineered Span: 36m (120ft) 100% Column-Free Span with 100% column-free interior volume
  • Structural Material: Precision Q355B Hot-Dip Galvanized or 6082-T6 Hard-Anodized Alloy
  • Membrane Cover: Flame Retardant Architectural PVDF (1200 g/m²)
  • Design Standards: Certified to ASCE 7-16, Eurocode EN 1991, and EN 13782
36m (120ft) Clear-Span Boeing 737-800 Line Maintenance Hangar - 65m Length Engineering CAD Blueprint
DWG / REVIT / STEP 3D COMPLIANT
Material Science & Metallurgy

Architectural PVDF Membrane Engineering Matrix (750g – 1400g/m²)

Pre-stressed, anti-wicking, low-creep architectural textiles engineered with multi-layer PVDF/PVF lacquering for self-cleaning performance, UV shielding (UPF 50+), and permanent flame retardancy.

Areal Weight Membrane Grade Tensile Strength (Warp/Weft) Tear Resistance Light Transmittance Temperature Range Fire Retardancy Standard Primary Industrial Role
750 g/m² Architectural PVC/PVDF 3000 / 2800 N/5cm 380 / 350 N 15% Translucent -30℃ ~ +70℃ DIN 4102 B1 / NFPA 701 Event Marquees, Canopy Sidewalls, Sailcloth Roofs
850 g/m² Heavy Duty Blockout PVDF 4000 / 3500 N/5cm 500 / 450 N 0% (100% Blockout) -40℃ ~ +70℃ DIN 4102 B1 / M2 / B-s2,d0 Standard Industrial Warehouses, Aluminum Clear Span
900 g/m² Reinforced Industrial Grade 4500 / 4000 N/5cm 550 / 500 N 10% Translucent -40℃ ~ +70℃ DIN 4102 B1 / NFPA 701 Container Mounted Shelters, Heavy Logistics Bays
1000 g/m² Extreme Weather Mining Grade 5000 / 4500 N/5cm 620 / 580 N 8% Translucent -45℃ ~ +75℃ DIN 4102 B1 / AS 1530 Mining Operations, Aggregate Domes, Salt Sheds
1100 g/m² High-Pressure Air Dome Membrane 5500 / 5000 N/5cm 750 / 700 N 12% Diffuse Glow -40℃ ~ +70℃ DIN 4102 B1 / EN 13501 Cable-Net Air Domes, Sports Arenas, Eco Storage
1200 g/m² Permanent Architectural PVDF/PTFE 6000 / 5500 N/5cm 850 / 800 N 8% Controlled Lux -50℃ ~ +80℃ Class A1 / DIN 4102 B1 Aviation Hangars, Permanent Terminals, Sports Stadiums
1400 g/m² Ultra-Heavy Marine & Blast Shield ≥7000 / 6500 N/5cm 1100 / 1000 N 0% Total Solar Block -50℃ ~ +85℃ DIN 4102 B1 / UL 94 V-0 Port Bulk Cargo, Military Fortified, Chemical Containment
✔ All membranes certified DIN 4102 B1, NFPA 701, and EN 13501-1 Class B-s2,d0
✔ 15-Year Pro-Rata Warranty with zero degradation under extreme coastal salt-spray
✔ Dual-layer thermal insulation liner options (R-12 to R-24) available across all weights
Field Construction Protocol

Engineered 8-Step Installation Methodology for 36m (120ft) Clear-Span Boeing 737-800 Line Maintenance Hangar - 65m Length

Rapid deployment methodology requiring zero on-site welding. Modular bolted connections reduce field erection schedules by up to 70% compared to conventional structural steel.

01

Topographical Survey & Grid Staking

Laser level and total station establish precise axial centerlines, column offsets, and elevation datums across the clear-span foundation grid.

02

Base Plate Anchoring & Torquing

Heavy cast-in base plates, chemical anchor studs (Grade 8.8), or helical earth anchors are drilled and torqued to specified kN pullout resistance.

03

Ground Truss Assembly & Lacing

Space-frame chord segments, web lacing members, and connection gusset plates are assembled and bolted flat on grade prior to hoisting.

04

Synchronized Crane Hoisting

Mobile cranes elevate paired structural truss arches into vertical position; temporary stabilizing guy wires maintain plumbness and stability.

05

Purlins, Struts & X-Cable Bracing

Longitudinal purlins, eaves struts, and pre-stretched galvanized X-bracing cables are torqued into place to form a rigid 3D spatial diaphragm.

06

Keder Membrane Track Tensioning

High-tenacity PVDF roof panels are pulled through integrated aluminum extrusion tracks and mechanically tensioned via ratchet catenary winches.

07

Endwalls, Megadoors & Flashings

Hard-wall panels, vertical-lifting Megadoors, motorized louvers, perimeter rainwater gutters, and architectural flashing trims are sealed.

08

FEA Pre-Stress Torque Audit & Signoff

Calibrated torque audit of all structural fasteners, ultrasonic weld verification, membrane pre-stress tensiometer inspection, and handover documentation.

Download Full Erection Manual & Stamped CAD Drawings →

Need Custom Site Dimensions or Stamped Engineering Calculations?

Our structural engineering team provides certified calculations, foundation reactions, and full 3D CAD/BIM packages within 24 hours.

Speak With a Senior Structural Engineer