Civil & Geotechnical Engineering

Foundation Reactions & Anchor Schedules
100m (328ft) Span Power Plant Zero-Dust Coal Dome - 190m Length

Detailed base plate shear, uplift, compression reactions, and anchor bolt embedment specifications for local civil engineering coordination of Model air-dome-100m-span-190m-len.

Request Anchor Bolt CAD Template View Product Specifications →
Civil Interface Data

Base Plate Reaction Loads for Model air-dome-100m-span-190m-len

Clear Span Envelope100m (328ft) Zero-Column Span × 190m (623ft) Continuous Enclosure
Horizontal Shear (Vx)Calculated per site wind speed and portal base pin
Maximum Uplift Tension (Tz)Critical load case during high hurricane gust events
Base Plate ConnectionGrade 8.8 / Grade 10.9 HDG Anchor Rods
Foundation OptionsCast Concrete Piers / Continuous Footings / Concrete Bunker Walls
Manufacturing EntitySpanbest Industry Co., Ltd. (Hunan Champion & Guangzhou Tentsen)
Speak With a Foundation Design Engineer →