Civil & Geotechnical Engineering

Foundation Reactions & Anchor Schedules
25m (82ft) x 85m Heavy Clear-Span Industrial Fabric Building (FB25)

Detailed base plate shear, uplift, compression reactions, and anchor bolt embedment specifications for local civil engineering coordination of Model fabric-building-fb25-85m.

Request Anchor Bolt CAD Template View Product Specifications →
Civil Interface Data

Base Plate Reaction Loads for Model fabric-building-fb25-85m

Clear Span Envelope25m (82ft) Clear Span × 85m (278ft) Modular Length
Horizontal Shear (Vx)Calculated per site wind speed and portal base pin
Maximum Uplift Tension (Tz)Critical load case during high hurricane gust events
Base Plate ConnectionGrade 8.8 / Grade 10.9 HDG Anchor Rods
Foundation OptionsCast Concrete Piers / Continuous Footings / Concrete Bunker Walls
Manufacturing EntitySpanbest Industry Co., Ltd. (Hunan Champion & Guangzhou Tentsen)
Speak With a Foundation Design Engineer →